The True Ribbon Diversion - Part 3.

These photos are current as of October 27, 1998. The next tasks are to create/fabricate the micrometer cutting edge on the bench for cutting of the ribbons and to align the crossbars in the oak framework and permanently affix them to the framework.

The completed pole pieces with copper foil applied to pole faces. The bench is littered with various of the necessary items required for the construction, including the liquid lubricant shown at the end of the bench.

The following four sets of photos show details of the constuction and the materials:

Pole piece photos.

Crossbar photos.

Tools & continuity photos.

Meditation photos.

Ribbons - Table of Contents.
Dipole Baffle Study - Table of Contents.